A British company laid three fiberglass pipes 200 feet long up a Devon hillside and filled them with a fluid dense enough to float concrete, and the government’s final report says the plant hit 500 kilowatts but can hold that output for about 15 minutes, not the four hours it was built for
Autonocion.com · 11月15日
インプレッション6.7万
ビジネス、産業D2TR で確認
A 1.88-inch setup error on a Washington campus reactor sent a pulse rod out of its cylinder at 9.13 inches instead of 7.25, because the operator used the numbers for the wrong control rod, and the fuel peaked at about 1,598°F, some 72 degrees over the pulse limit but under the safety limit
Autonocion.com · 11月17日
インプレッション2.9万
ビジネス、産業D2TR で確認
A 92-turbine wind farm on the South Dakota prairie had more than 20 of its machines wrecked and nearly 300-foot steel towers folded in half by a 131-mph gust in June, and early on an October Monday firefighters drove 10 miles south of Highmore to a turbine
Autonocion.com · 11月18日
インプレッション1.4万
ビジネス、産業D2TR で確認
A 21-foot-wide shaft has reached 5,203 feet under a Quebec gold mine whose open pit had part of its north wall move this summer, and its 305-foot headframe is now trading the sinking gear for a production hoist sized for about 22,000 tons a day, with shaft hoisting due next spring
Autonocion.com · 11月14日
インプレッション1万
ビジネス、産業D2TR で確認
A 590-megawatt reactor on the Lake Michigan shore shut itself down from full power at 5:12 in the morning when its main generator locked out, its leftover heat went out as steam through valves that vent to the open air, and three days later the 56-year-old unit was still at zero